Published August 1976 | Version v1
Report Open

Evaluation of environmental data relating to selected nuclear power plant sites. Kewaunee Nuclear Power Plant site

Description

Environmental monitoring data for the years 1973, 1974 and 1975 pertaining to the Kewaunee Plant, which began operation in mid-1974, were analyzed by qualitative and quantitative methods. The results showed no significant immediate deleterious effects, thus confirming preoperational predictions. Although the plant has not operated long enough to reveal long-term deleterious effects, the present indications do not lead to a prediction that any are developing. The data acquired, method of analysis, and results obtained are presented in detail along with recommendations for improving monitoring techniques

Availability note (English)

MF available from INIS under the Report Number.

Files

8293497.pdf

Files (4.4 MB)

Name Size Download all
md5:b8f993512721e032dce097bf96ad4e04
4.4 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
243 p.
Report number
ANL/EIS--1

Optional Information

Notes
Available from NTIS. $8.00.