Published May 24, 1995 | Version v1
Report Open

B plant mission analysis report

Description

This report further develops the mission for B Plant originally defined in WHC-EP-0722, ''System Engineering Functions and Requirements for the Hanford Cleanup Mission: First Issue.'' The B Plant mission analysis will be the basis for a functional analysis that breaks down the B Plant mission statement into the necessary activities to accomplish the mission. These activities are the product of the functional analysis and will then be used in subsequent steps of the systems engineering process, such as identifying requirements and allocating those requirements to B Plant functions. The information in this mission analysis and the functional and requirements analysis are a part of the B Plant technical baseline

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95013901; NTIS; US Govt. Printing Office Dep.

Files

26074270.pdf

Files (630.9 kB)

Name Size Download all
md5:3cee709c5a1c1b6b49229525adf62d2f
630.9 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
23 p.
Report number
WHC-SD--WM-MAR-006

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).