Published May 24, 1995
| Version v1
Report
Open
B plant mission analysis report
Description
This report further develops the mission for B Plant originally defined in WHC-EP-0722, ''System Engineering Functions and Requirements for the Hanford Cleanup Mission: First Issue.'' The B Plant mission analysis will be the basis for a functional analysis that breaks down the B Plant mission statement into the necessary activities to accomplish the mission. These activities are the product of the functional analysis and will then be used in subsequent steps of the systems engineering process, such as identifying requirements and allocating those requirements to B Plant functions. The information in this mission analysis and the functional and requirements analysis are a part of the B Plant technical baseline
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE95013901; NTIS; US Govt. Printing Office Dep.Files
26074270.pdf
Files
(630.9 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:3cee709c5a1c1b6b49229525adf62d2f
|
630.9 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 23 p.
- Report number
- WHC-SD--WM-MAR-006
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26074270
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- CESIUM; DECOMMISSIONING; DECONTAMINATION; HANFORD RESERVATION; RADIOACTIVE WASTE MANAGEMENT; STRONTIUM
- Descriptors DEC
- ALKALI METALS; ALKALINE EARTH METALS; CLEANING; ELEMENTS; MANAGEMENT; METALS; NATIONAL ORGANIZATIONS; US DOE; US ORGANIZATIONS; WASTE MANAGEMENT
Optional Information
- Contract/Grant/Project number
- Contract AC06-87RL10930
- Funding organization
- USDOE, Washington, DC (United States).