Published 2000 | Version v1
Book

Evaluation of risk on the preventive maintenance of Ulchin Units 3 and 4 during power operation

  • 1. Korea Atomic Energy Research Inst. (Korea, Republic of)

Description

In this paper, the risk assessments on the change of AOT and the PM during power operation of the major safety systems for Ulchin Units 3 and 4 were performed to identify the possibility of their on-line PM. The results of this study show that the current AOT of LPSIS, SCS, and CSS can be increased to 7 days and that of EDG to 10 days. Also, the results show that the on-line PM of LPSIS, SCS, CSS, EDG, ECWS, ESWS, and CCWS for Ulchin Units 3 and 4 can be performed without greatly increasing the risk. (author)

Part of:
PSAM 5: Probabilistic safety assessment and management

Additional details

Publishing Information

Publisher
Universal Academy
Imprint Place
Tokyo (Japan)
ISBN
4-946443-64-9
Imprint Title
PSAM 5: Probabilistic safety assessment and management
Imprint Pagination
2820 p.
Journal Page Range
p. 679-684

Conference

Title
5. international conference on probabilistic safety assessment and management
Acronym
PSAM 5
Dates
27 Nov - 1 Dec 2000
Place
Osaka (Japan)

Optional Information

Notes
Vol. 2/4 Imprint:Published in 4 volumes, also available on CD-ROM can be used for Windows 95/98/2000, Macintosh and UNIX. Also published in Frontiers Science Series No.34, ISSN 0915-8502