Published September 2019 | Version v1
Journal article

Tests and developments of a long-pulse high-power 170 GHz absorbing matched load

  • 1. Consiglio Nazionale delle Ricerche, Istituto di Fisica del Plasma (IFP), Milan (Italy)
  • 2. L.T. Calcoli S.r.l. (LTC), Merate (Italy)

Description

The future EC systems will consist of several gyrotron sources providing MW-level millimeter wave power at a frequency around or above 170 GHz. The development of matched loads is necessary to test the new sources, the components for the transmission lines and the launchers, and must ensure high qualification for compatibility with the nuclear environment. The development at IFP-CNR and LTC of several compact high-power prototypes during the last decade led to a refinement of the overall design, resulting in the present low-reflectivity vacuum-compatible loads. The activity on loads is supported by F4E in view of the development of the EU gyrotron for ITER and required high-power tests at QST (Naka, Japan). Qualification is now supported by new tests at SPC (Lausanne, Switzerland) using the FALCON test-bed designed to test components and the EU gyrotron prototype for the EC system of ITER. These high-power tests, performed on the first CW prototype load (provided with 16 + 16 cooling channels in parallel) and shown in this paper, highlighted the need to improve the mechanical, vacuum and hydraulic design to reach the final goal of 1000s at ∼1 MW.

Availability note (English)

Available from http://dx.doi.org/10.1016/j.fusengdes.2018.11.019

Additional details

Identifiers

DOI
10.1016/j.fusengdes.2018.11.019;
PII
S0920379618307270;

Publishing Information

Journal Title
Fusion Engineering and Design
Journal Volume
146
Journal Page Range
p. 36-39
ISSN
0920-3796
CODEN
FEDEEE

Conference

Title
SOFT-30: 30. Symposium on fusion technology
Acronym
SI
Dates
16-21 Sep 2018
Place
Giardini Naxos, Sicily (Italy)

Optional Information

Copyright
Copyright (c) 2018 Elsevier B.V. All rights reserved.