Published July 1994 | Version v1
Journal article

Time dependence of criteria for implementation of WWER-440/213 decommissioning alternatives

  • 1. Slovenska Technicka Univerzita, Elektrotechnicka Fakulta, Bratislava (Slovakia)

Description

The results of an analysis are summarized and three alternatives for the decommissioning of WWER-440/213 reactors are described, namely: (i) fragmentation of the reactor in the concrete reactor shaft; (ii) fragmentation of the internal parts of the reactor inside the pressure vessel in the concrete shaft, followed by transport and fragmentation of the pressure vessel at a special fragmentation site; and (iii) disintegration of the reactor as a whole. The last alternative appears to be least suitable. (J.B.). 3 tabs., 5 figs., 9 refs

Additional details

Additional titles

Original title (Czech)
Casova zavislost kriterii realizace variant likvidace reaktoru VVER-440/213

Publishing Information

Journal Title
Energetika (Prague)
Journal Volume
44
Journal Issue
3
Journal Page Range
p. 75-79.
ISSN
0375-8842
CODEN
EGKAA2

Optional Information

Notes
English translation available from Nuclear Information Center, 156 16 Prague-Zbraslav, Czechoslovakia, at USD 10.- per typewritten page.