D0 Central Tracking Solenoid Energization, Controls, Interlocks and Quench Protection Initial Validation Procedures
Description
This note presents the inspection and tests to be performed on the DZERO solenoid energization, controls, interlocks and quench protection system before it is energized for the first time. This test is to be performed with a 5000A jumper at the end of the bus instead of the solenoid. This system is based in DZERO room 511. A copy of this note shall be annotated, signed and dated by the person coordinating the procedure; and filed with the system maintenance records. Annotations shall include comments about any aspect of the procedure that is abnormal or unsuccessful. The following inspections and tests shall be performed by persons knowledgeable about the system. Each individual test step should be reviewed and understood before proceeding with that step.
Availability note (English)
Available from http://lss.fnal.gov/cgi-bin/find_paper.pl?d0-en-525.pdf.pdf; PURL: https://www.osti.gov/servlets/purl/1032085/Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 31 p.
- Report number
- FERMILAB-D--0-EN-525
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 43017726
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- CONTROL SYSTEMS; FERMILAB TEVATRON; INSPECTION; INTERLOCKS; MAINTENANCE; PARTICLE TRACKS; QUENCHING; SOLENOIDS; SPECIFICATIONS; TESTING; VALIDATION
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; ELECTRIC COILS; ELECTRICAL EQUIPMENT; EQUIPMENT; SYNCHROTRONS; TESTING
Optional Information
- Contract/Grant/Project number
- AC02-07CH11359
- Notes
- doi 10.2172/1032085
- Funding organization
- DOE Office of Science (United States)