Nuclear systems and testing programs for ITER. Progress report for FY 1998
Description
The effort during this performance period focused on a number of TBWG activities (including test module design and analysis) that were identified and agreed upon (in the presence of the ITER Director and Deputy Director) at TBWG-4. These include: (a) DEMO test module design and performance analysis under pulsed operation; (b) Test program operation plan; (c) Test port design and analysis; (d) Decay heat calculations and safety analysis; (e) Further discussion among the parties to define collaboratory on R and D for the test program as well as possible collaboration on the construction and operation of test articles; (f) Remote handling and ancillary equipment; (g) Criteria for qualifying a blanket module or submodule for actual insertion and testing in ITER; (h) Definition of test module instrumentation and verification of capability to perform in the ITER fusion environment (magnetic field, radiation, heating, etc.); and (i) Analysis to show that the results to be obtained from the test modules as designed can be extrapolated to DEMO and reactor conditions (e.g., higher wall loads and the need to demonstrate tritium self-sufficiency). The main achievements during this performance period include: (1) updating and finalizing the US DDDs for the ITER Blanket Program to form part of the ITER Final Design Report (FDR). Specific revisions were in response to the minimal lithium volume test blanket design requirements and safety impact and (2) evaluating the feasibility of the US test program, including instrumentation and the benefits of the ITER test program. Details of this assessment, including solid breeder and liquid breeder blanket test plans, are documented in UCLA-IFNT-13 (attached). In addition, dose mapping calculations were performed for the ITER Building, including equipment and layout of coolant pipes/heat exchangers. A report on ITER Building dose calculations was sent to UD ITER management and to the Garching Task Coordinator in April, 1998. The report entitled Three-Dimensional Calculations of ITER Building Dose Rate Profiles and Assessment of Accessibility Inside the Building During Operation and After Shutdown of ITER can be located through ITER Reference Number of ITER Task S 62 TD 12, ID No: D325 ITER/US/98/S62TD12-D325 UCLA-FNT-100 UCLA-ENG-98-190
Availability note (English)
Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99002853; NTIS; US GOVT. PRINTING OFFICE DEP.
Files
Additional details
Publishing Information
- Imprint Pagination
- 25 p.
- Report number
- DOE/ER/52150--T3
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 30053025
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY; S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
- Resource subtype / Literary indicator
- Progress Report
- Descriptors DEI
- BREEDING BLANKETS; DEMONSTRATION PROGRAMS; DESIGN; ITER TOKAMAK; PROGRESS REPORT; RADIOACTIVITY; REMOTE HANDLING EQUIPMENT; SITE CHARACTERIZATION; TEST FACILITIES; THERMONUCLEAR REACTOR COOLING SYSTEMS
- Descriptors DEC
- CLOSED PLASMA DEVICES; COOLING SYSTEMS; DOCUMENT TYPES; ENERGY SYSTEMS; EQUIPMENT; MATERIALS HANDLING EQUIPMENT; THERMONUCLEAR DEVICES; THERMONUCLEAR REACTORS; TOKAMAK DEVICES; TOKAMAK TYPE REACTORS
Optional Information
- Contract/Grant/Project number
- Contract FG03-88ER52150
- Funding organization
- USDOE Office of Energy Research, Washington, DC (United States)