Published 1994 | Version v1
Book

Treatment of uncertainty in the NRC regulatory process

  • 1. Winston ampersand Strawn, Washington, DC (United States)

Description

The information gained during the one to two decades of initial site characterization of Yucca Mountain, Nevada by the Department of Energy (DOE) will be used to make preliminary predictions about the suitability of the site to be developed as a geologic repository. If Yucca Mountain is designated as suitable for application for a construction authorization pursuant to the terms and conditions of the Nuclear Waste Policy Act (NWPA), as amended, then DOE will submit to the Nuclear Regulatory Commission (NRC) an application for a construction authorization. Much of the information supporting site recommendation and a construction authorization will be subject to significant uncertainty. However, both the NWPA and applicable NRC regulations are structured to accommodate this uncertainty in the administrative decisionmaking process such that appropriate determinations can be made at each stage of repository development, operation and permanent closure

Additional details

Publishing Information

Publisher
American Nuclear Society, Inc.
Imprint Place
La Grange Park, IL (United States)
Imprint Title
High Level Radioactive Waste Management: Proceedings of the fifth annual international conference. Volume 3
Imprint Pagination
699 p.
Journal Page Range
p. 1404-1416.

Conference

Title
International high-level radioactive waste management conference.
Dates
22-26 May 1994.
Place
Las Vegas, NV (United States).