Published May 30, 2008 | Version v1
Report Open

Remaining Sites Verification Package for the 100-F-44:2, Discovery Pipeline Near 108-F Building. Attachment to Waste Site Reclassification Form 2007-006

Description

The 100-F-44:2 waste site is a steel pipeline that was discovered in a junction box during confirmatory sampling of the 100-F-26:4 pipeline from December 2004 through January 2005. The 100-F-44:2 pipeline feeds into the 100-F-26:4 subsite vitrified clay pipe (VCP) process sewer pipeline from the 108-F Biology Laboratory at the junction box. In accordance with this evaluation, the confirmatory sampling results support a reclassification of this site to No Action. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of confirmatory sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00944162; PURL: https://www.osti.gov/servlets/purl/944162-YB4blm/

Files

40029188.pdf

Files (16.3 MB)

Name Size Download all
md5:ff62a4c898e738974df81159f2ca49d4
16.3 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
36 p.
Report number
RSVP--2007-006

Optional Information

Contract/Grant/Project number
AC06-05RL14655
Notes
doi 10.2172/944162
Funding organization
US Department of Energy (United States)