Hydropower development priority using MCDM method
- 1. Department of Civil Engineering, Chiang Mai University, Chiang Mai 50200 (Thailand)
- 2. Department of Water Resource Engineering, Kasetsart University, Bangkhen Campus, Bangkok 10900 (Thailand)
- 3. Electricity Generating Authority of Thailand, Bang Kruai, Nonthaburi 11130 (Thailand)
Description
Hydropower is recognized as a renewable and clean energy sources and its potential should be realized in an environmentally sustainable and socially equitable manner. Traditionally, the decision criteria when analyzing hydropower projects, have been mostly a technical and economical analysis which focused on the production of electricity. However, environmental awareness and sensitivity to locally affected people should also be considered. Multi-criteria decision analysis has been applied to study the potential to develop hydropower projects with electric power greater than 100 kW in the Ping River Basin, Thailand, and to determine the advantages and disadvantages of the projects in five main criteria: electricity generation, engineering and economics, socio-economics, environment, and stakeholder involvement. There are 64 potential sites in the study area. Criteria weights have been discussed and assigned by expert groups for each main criteria and subcriteria. As a consequence of weight assignment, the environmental aspect is the most important aspect in the view of the experts. Two scenarios using expert weight and fair weight have been studied to determine the priority for development of each project. This study has been done to assist policy making for hydropower development in the Ping River Basin.
Availability note (English)
Available from http://dx.doi.org/10.1016/j.enpol.2009.01.023Additional details
Identifiers
- DOI
- 10.1016/j.enpol.2009.01.023;
- PII
- S0301-4215(09)00039-1;
Publishing Information
- Journal Title
- Energy Policy
- Journal Volume
- 37
- Journal Issue
- 5
- Journal Page Range
- p. 1866-1875
- ISSN
- 0301-4215
- CODEN
- ENPYAC
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 41044409
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Descriptors DEI
- ECONOMICS; ENVIRONMENTAL AWARENESS; ENVIRONMENTAL ENGINEERING; FUZZY LOGIC; HUMAN POPULATIONS; HYDROELECTRIC POWER; MATHEMATICAL MODELS; POWER GENERATION; SOCIO-ECONOMIC FACTORS; THAILAND
- Descriptors DEC
- ASIA; DEVELOPING COUNTRIES; ELECTRIC POWER; ENERGY SOURCES; ENGINEERING; INSTITUTIONAL FACTORS; MATHEMATICAL LOGIC; POPULATIONS; POWER; PUBLIC OPINION; RENEWABLE ENERGY SOURCES
Optional Information
- Copyright
- Copyright (c) 2009 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.