Published September 2004 | Version v1
Journal article

Rehabilitation of the 6 largest hydropower plants in the Republic of Macedonia

  • 1. Electric Power Co. of Macedonia, Skopje (Macedonia, The Former Yugoslav Republic of)

Description

In 1998, ESM (Electric Power Co. of Macedonia) received a loan from the International Bank for Reconstruction and Development (IBRD - The World bank) for the cost of the Power System Improvement Project, major part of which is the partial rehabilitation of the six largest HPPs in the Republic of Macedonia. Rehabilitation and life extension of these six largest hydro power plants is given the highest priority in the whole Power System Improvement Project mainly because these HPPs are, in general, fairly old, older than most of the thermal generation capacity and because a significant part of their equipment is wearing out, or is now obsolete with spare parts difficult to obtain. Furthermore, these plants play a vital role in the Macedonian Power System, providing peaking capacity, reserve capacity and frequency control. With the realization of this project, greater hydropower production is expected. It is also expected that HPPs will become a more vital part of the Macedonian Power System, which is also beneficial from an environmental aspect, due to greater usage of renewable energy resources in the country. (Original)

Additional details

Additional titles

Original title (Macedonian)
Rehabilitacija na sheste golemi hidrocentrali vo Republika Makedonija

Publishing Information

Journal Title
Energetika
Journal Volume
12
Journal Issue
44
Series
Continuation from v. 12(43)
Journal Page Range
p. 18-22
ISSN
1409-6048

Optional Information

Notes
1 fig., 5 ills., 3 refs.