Published October 2012 | Version v1
Miscellaneous

Sub compartment pressurization analysis for auxiliary building of APR1400DC

  • 1. Atomic Creative Technology, Daejeon (Korea, Republic of)

Description

Generally, the sub compartment of PWR means a fully or partially enclosed volume that could house high-energy piping systems or restrict the flow of fluid in the event of a postulated pipe rupture. To meet the requirements of General Design Criteria (GDC) 4 and 50, Standard Review Plan (SRP) 6.2.1.2 states that the sub compartments shall be designed with sufficient margin to prevent the fracture of structure due to pressure differential across the walls of the sub- compartment and specifies the criteria related to the design and functional sub compartment nodalization schemes, vent flow path and vent flow behavior. Therefore the sub compartments structures within the containment and auxiliary building are designed to withstand the transient differential pressures loads, jet impingement forces, and pipe whip forces occurring due to a postulated pipe break. In this paper, the analyses of pressure transients after a postulated pipe rupture in sub compartments of APR1400DC auxiliary building is performed and the calculated peak differential pressures during the piping break transients for each sub compartment are less than structural design differential pressures

Part of:
Proceedings of the KNS autumn meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2012 autumn meeting of the KNS
Dates
24-26 Oct 2012
Place
Kyoungju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
44062837
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
COMPUTER CALCULATIONS; DESIGN; PIPES; PRESSURIZATION; PWR TYPE REACTORS; RUPTURES; TRANSIENTS
Descriptors DEC
ENRICHED URANIUM REACTORS; FAILURES; POWER REACTORS; REACTORS; THERMAL REACTORS; TUBES; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
7 refs, 6 figs