Published 1987 | Version v1
Report Restricted

Plutonium production in a remote cell

Description

Production of 239Pu metal has traditionally been carried out in glovebox enclosures for protection of operating personnel and the environment. With the advent of more stringent federal regulations for protecting personnel, the environment, and security of special nuclear materials, it is proposed that plutonium be processed in a totally remote environment using automated work stations and robotic materials transfer and equipment maintenance. At the Savannah River Plant, the existing plutonium production facility is a batch-type glovebox operation built in the 1950s. A viable alternative to restoration of the existing glovebox operation is to provide a facility that uses remote cell operation

Availability note (English)

Available from NTIS, PC A02/MF A01; 1 as DE88001375.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
DP-MS--87-83

Conference

Title
Joint meeting of the American Nuclear Society and the Atomic Industrial Forum.
Dates
15-19 Nov 1987.
Place
Los Angeles, CA (USA).

Optional Information

Notes
Portions of this document are illegible in microfiche products.
Secondary number(s)
CONF-871101--65.