Surry unit 2 end of cycle 4 onsite fuel examination: reduced data and operating history
Description
Onsite nondestructive examinations were performed at the end of reactor cycle 4 on 17 x 17 demonstration assemblies irradiated in the Surry Unit 2 reactor during cycles 2, 3, and 4. Two three-cycle 17 x 17 demonstration fuel assemblies, four two-cycle 17 x 17 removable fuel rods, and eight three-cycle 17 x 17 removable fuel rods were examined. These examinations included television visual examinations and grid cell friction force measurements performed on the fuel assemblies and breakaway/withdrawal force measurements, television visual examinations, and profilometry measurements performed on the removable fuel rods. The actual reduced onsite data from the breakaway/withdrawal force measurements, the grid cell friction force measurements, and the profilometry measurements are contained in this report
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A04/MF A01.
Files
Additional details
Publishing Information
- Imprint Pagination
- 52 p.
- Report number
- WCAP--9839
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 12638991
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- BURNUP; FUEL ASSEMBLIES; FUEL RODS; INSPECTION; NONDESTRUCTIVE TESTING; PERFORMANCE; POWER DISTRIBUTION; REACTOR OPERATION; SURRY-2 REACTOR
- Descriptors DEC
- ENRICHED URANIUM REACTORS; FUEL ELEMENTS; MATERIALS TESTING; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTORS; TESTING; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS