Nuclear plant piping criteria and construction costs: Final report
Description
A workshop on Nuclear Power Piping Constructibility attended by architect-engineers, utilities, fabricators, and nuclear steam system suppliers has identified cost-reducing modifications and improvements in the design and construction of piping systems. Among the measures that can reduce piping costs are: stabilization of design practices and regulations, improvement of acceptance criteria for as-built piping tolerances, reduction of piping supports, increased use of computer-aided construction, and reduction of field changes by making welding acceptance criteria more realistic. Participants categorized and prioritized areas for recommended industry actions involving either available and advanced technology
Availability note (English)
Research Reports Center, Box 50490, Palo Alto, CA 94303.Additional details
Publishing Information
- Imprint Pagination
- 83 p.
- Report number
- EPRI-NP--4843-S
Conference
- Title
- Workshop on nuclear piping constructibility.
- Dates
- 12-14 Dec 1984.
- Place
- Charlotte, NC (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 19005608
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S42: ENGINEERING;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- CONSTRUCTION; COST; INDUSTRY; INSPECTION; MANAGEMENT; NUCLEAR POWER PLANTS; PIPES; REACTOR COOLING SYSTEMS; REGULATIONS; REPORTING REQUIREMENTS; RESTRAINTS; SPECIFICATIONS; STEAM; TESTING; WELDING
- Descriptors DEC
- COOLING SYSTEMS; FABRICATION; JOINING; LAW; NUCLEAR FACILITIES; POWER PLANTS; REACTOR COMPONENTS; THERMAL POWER PLANTS
Optional Information
- Secondary number(s)
- CONF-8412122--.