Published November 1986 | Version v1
Report

Nuclear plant piping criteria and construction costs: Final report

Description

A workshop on Nuclear Power Piping Constructibility attended by architect-engineers, utilities, fabricators, and nuclear steam system suppliers has identified cost-reducing modifications and improvements in the design and construction of piping systems. Among the measures that can reduce piping costs are: stabilization of design practices and regulations, improvement of acceptance criteria for as-built piping tolerances, reduction of piping supports, increased use of computer-aided construction, and reduction of field changes by making welding acceptance criteria more realistic. Participants categorized and prioritized areas for recommended industry actions involving either available and advanced technology

Availability note (English)

Research Reports Center, Box 50490, Palo Alto, CA 94303.

Additional details

Publishing Information

Imprint Pagination
83 p.
Report number
EPRI-NP--4843-S

Conference

Title
Workshop on nuclear piping constructibility.
Dates
12-14 Dec 1984.
Place
Charlotte, NC (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
19005608
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS; S42: ENGINEERING;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
CONSTRUCTION; COST; INDUSTRY; INSPECTION; MANAGEMENT; NUCLEAR POWER PLANTS; PIPES; REACTOR COOLING SYSTEMS; REGULATIONS; REPORTING REQUIREMENTS; RESTRAINTS; SPECIFICATIONS; STEAM; TESTING; WELDING
Descriptors DEC
COOLING SYSTEMS; FABRICATION; JOINING; LAW; NUCLEAR FACILITIES; POWER PLANTS; REACTOR COMPONENTS; THERMAL POWER PLANTS

Optional Information

Secondary number(s)
CONF-8412122--.