Comprehensive report to Congress, Clean Coal Technology program: Pinon Pine IGCC Power Project

Description

The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, fluidized-bed KRW gasifier with in-bed desulfurization using limestone sorbent and an external fixed- bed zinc ferrite sulfur removal system. Sierra Pacific Power Company (SPPC) requested financial assistance from DOE for the design, construction, and operation of a nominal 800 ton-per-day (86-Megawatt gross), air blown integrated gasification combined-cycle (IGCC) demonstration plant. The project, named the Pinon Pine IGCC Power Project, is to be located at SPPC's Tracy Station, a power generation facility located on a rural 400-acre plot about 17 miles east of Reno. The demonstration plant will produce electrical power for the utility grid. The project, including the demonstration phase, will last 96 months at a total cost of $269,993,100. DOE's share of the project cost will be 50 percent, or $134,996,550

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE92015632; NTIS; INIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
26 p.
Report number
DOE/FE--0255P