Published October 2010 | Version v1
Miscellaneous

A Baseline Confirmation for MELCOR DB Construction

  • 1. Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

Description

A baseline calculation for MELCOR database (DB) is confirmed for OPR-1000 as a target plant. This is an essential process to provide firm ground before all calculations and analysis are to be made for DB extension in the next stage. For this study, MELCOR major input is checked and assessed via comparing the system behavior between MELCOR and MAAP4 codes for station blackout (SBO) scenarios as a typical high pressure sequence. The following variables in core, primary system (RCS) and steam generator (SG) until reactor vessel failure time are selected for the system behavior confirmation. - Core: fuel temperature - RCS: primary pressure - SG: pressure/temperature and mass inventory

Part of:
Proceedings of the KNS autumn meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2010 autumn meeting of the KNS
Dates
21-22 Oct 2010
Place
Jeju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
42085229
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
COMPUTER CALCULATIONS; M CODES; PWR TYPE REACTORS; REACTOR VESSELS; STEAM GENERATORS
Descriptors DEC
BOILERS; COMPUTER CODES; CONTAINERS; ENRICHED URANIUM REACTORS; POWER REACTORS; REACTORS; THERMAL REACTORS; VAPOR GENERATORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
4 refs, 6 figs, 3 tabs