Published January 1993 | Version v1
Report Open

Erosion-corrosion prediction and inspection program for Krsko NPP

  • 1. Westinghouse Energy Systems International, Brussels (Belgium)
  • 2. Westinghouse NATD, Pittsburgh PA (United States)
  • 3. Nuclearna Elektrarna KRSKO (Slovenia)

Description

Pipe wall thinning through erosion-corrosion (E/C) is a problem receiving much attention in the nuclear and non-nuclear industry, and is also involved in the Krsko nuclear power plant. In 1991, the Krsko plant decided to upgrade its inspection programme and acquired computerized systems for thickness data acquisition, management and evaluation. The Krsko plant and Westinghouse performed a systematic E/C prediction analysis for all carbon-steel high-energy piping, using the state-of-the-art computer model using the EPRI (Electric Power Research Institute) code CHECKMATE. The E/C predictions and the results of past inspections were combined to redefine a new inspection plan starting with the spring 1992 outage. The first phase of the project is described including computer modelling and the inspection plan prepared for the upcoming outage. (Z.S.) 1 tab., 4 figs., 3 refs

Files

24042359.pdf

Files (231.4 kB)

Name Size Download all
md5:68bbe070b4b3b223d1a0f06cc3143560
231.4 kB Preview Download
Part of:
Topform '92: the safe and reliable operation of LWR NPPs. Vol. II

Additional details

Publishing Information

Imprint Title
Topform '92: the safe and reliable operation of LWR NPPs. Vol. II
Imprint Pagination
245 p.
Journal Page Range
p. 89-95.
Report number
INIS-mf--13503

Conference

Title
ENS East-West topical meeting on the safe and reliable operation of LWR NPPs.
Acronym
ENS Topform '92
Dates
18-21 Oct 1992.
Place
Prague (Czechoslovakia).

INIS

Country of Publication
Serbia and Montenegro
Country of Input or Organization
Serbia and Montenegro
INIS RN
24042359
Subject category
S42: ENGINEERING;
Resource subtype / Literary indicator
Conference
Descriptors DEI
COMPUTERIZED SIMULATION; CORROSION; DATA PROCESSING; EROSION; FORECASTING; INSPECTION; KRSKO REACTOR; NUCLEAR POWER PLANTS; PIPES; PLANNING
Descriptors DEC
CHEMICAL REACTIONS; ENRICHED URANIUM REACTORS; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; SIMULATION; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information