Requirements Engineering Functions for the Nuclear Fuel Cycle Facility
Creators
- 1. Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)
Description
The pyro process system that has been carried out through research and development and design technology simultaneously made it difficult to interface between projects. Especially since the pyro process has to operate the devices remotely under the proper circumstances in the radiation control zone, the design of the facility and devices varies considerably from other than general facilities. A pyro process project management system for a pyro process facility has been designed in order to construct the PRIDE (PyRoprocess Integrated Demonstration facility) by using requirements engineering. An integrated project management system has been established. A WBS (Work Breakdown Structure) for the pyro process facility is being implemented to organize research and development project and to improve problems
Additional details
Publishing Information
- Publisher
- Pacific Nuclear Council
- Imprint Place
- La Grange Park (United States)
- Imprint Title
- Proceedings of the 18th Pacific Basin Nuclear Conference
- Imprint Pagination
- [1 CD-ROM]
- Journal Page Range
- [1 p.]
Conference
- Title
- 18. Pacific Basin Nuclear Conference
- Acronym
- PBNC 2012
- Dates
- 18-23 Mar 2012
- Place
- Busan (Korea, Republic of)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 45032678
- Subject category
- S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- BREAKDOWN; CONTROL; DESIGN; FUEL CYCLE; INTERFACES