Published November 9, 1990 | Version v1
Report Open

Evaluation of safety assessment methodologies in Rocky Flats Risk Assessment Guide (1985) and Building 707 Final Safety Analysis Report (1987)

  • 1. Science and Engineering Associates, Inc., Albuquerque, NM (United States)

Description

FSARs. Rockwell International, as operating contractor at the Rocky Flats plant, conducted a safety analysis program during the 1980s. That effort resulted in Final Safety Analysis Reports (FSARs) for several buildings, one of them being the Building 707 Final Safety Analysis Report, June 87 (707FSAR) and a Plant Safety Analysis Report. Rocky Flats Risk Assessment Guide, March 1985 (RFRAG85) documents the methodologies that were used for those FSARs. Resources available for preparation of those Rocky Flats FSARs were very limited. After addressing the more pressing safety issues, some of which are described below, the present contractor (EG ampersand G) intends to conduct a program of upgrading the FSARs. This report presents the results of a review of the methodologies described in RFRAG85 and 707FSAR and contains suggestions that might be incorporated into the methodology for the FSAR upgrade effort

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE94005656; NTIS; US Govt. Printing Office Dep.

Files

25059093.pdf

Files (2.8 MB)

Name Size Download all
md5:fc7a017071cac70014ef17d72c2e28a8
2.8 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
33 p.
Report number
LA-SUB--93-306

Optional Information

Contract/Grant/Project number
Contract W-7405-ENG-36
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
SEASF-TR--90-009.