Published 1988 | Version v1
Book

Seismic design of the waste-handling building at the prospective Yucca Mountain nuclear waste repository

  • 1. Sandia National Labs., Albuquerque, NM (USA). Nuclear Waste Engineering Projects Div.
  • 2. Bechtel National, Inc., San Francisco, CA (USA)

Description

The site for the first prospective high-level nuclear waste repository is located in Yucca Mountain at the southwest corner of the Nevada Test Site in Nye County, Nevada. The preliminary site investigation and seismic hazard evaluation indicate that the design ground acceleration in the horizontal direction of 0.40 g (with a vertical acceleration equal to two-thirds the horizontal) has a recurrence interval of 2,000 years. The site evaluation also indicates a potential for some fault displacement on the geologic faults near the site. Proposed facilities at the prospective repository include a waste handling building (WHB), the primary facility used for handling radioactive waste materials. This paper summarizes the structural behavior of the WHB resulting from the seismic loads. This summary includes a preliminary seismic evaluation of the WHB, and includes estimates of the seismic design margin, building performance, and the amount of fault displacement that the WHB can accommodate without structural yield failure

Additional details

Publishing Information

Publisher
American Nuclear Society.
Imprint Place
La Grange Park, IL (USA)
ISBN
0-89448-143-6
Imprint Title
Proceedings of the international topical meeting on nuclear and hazardous waste management
Imprint Pagination
630 p.
Journal Page Range
p. 174-176.

Conference

Title
international topical meeting on nuclear and hazardous waste management.
Acronym
Spectrum '88
Dates
11-15 Sep 1988.
Place
Pasco, WA (USA).

Optional Information

Secondary number(s)
CONF-880903--.