Published July 31, 2003 | Version v1
Journal article

Geothermal project will predetermine future of the Kosice heating plant

Creators

  • 1. TREND, POB 31, 82007 Bratislava 27 (Slovakia)

Description

Geoterm, a.s. manager O. Halas describes economic and technical parameters of geothermal energy source by village Durkov near Kosice. It is planned to exploitate geothermal energy source for Kosicka heating plant (TEKO). Three basic variants of technical connecting to geothermal source are developed. Temperature at TEKO entrance should reach 125 degrees, annual heating energy supply will reach 2100 TJ and source output will reach 100 MWt, while admissible deviation at all indicators reaches 10%. The first geothermal energy should by supplied to TEKO in 2007. The investments overlapping 3 billions Slovak crowns are necessary to realize whole project. According to O. Halas a credit from World Bank guaranteed by state is crucial

Availability note (English)

Also available: English translation can be ordered from the Omega Info, Vysehradska 33, 85106 Bratislava, Slovak Republic (e-mail: info@omegainfo.sk), at USD 10.00 per standard page (1800 characters)

Additional details

Additional titles

Original title (Slovak)
Geotermalny projekt predurci buducnost kosickej teplarne

Publishing Information

Journal Title
Trend. Tyzdennik o hospodarstve a podnikani
Journal Volume
13
Journal Issue
31
Journal Page Range
p. 39
ISSN
1335-0684

Optional Information

Notes
1 fig.