Published June 12, 1995 | Version v1
Report Open

Development and determination of a single-shell tank interim stabilization pumping strategy

Description

This activity plan addresses the technique and steps involved in simulating a riser installation in the dome of a single-shell waste storage tank by the used of a rotary drill rig. This simulation will provide information to avoid potential inadequacies in planning and field efforts in a nonradiological environment. Personnel can be trained in a nonradiological environmental while perfecting techniques for drilling and installing risers. It is essential that field equipment and installation procedures be perfected before the installation of risers in SSTs occurs. Time spent installing the actual risers in the SSTs will be minimized, aiding in safety of personnel and conformance to ALARA principles

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95015819; NTIS; US Govt. Printing Office Dep.

Files

27002759.pdf

Files (1.5 MB)

Name Size Download all
md5:348167106b1c5e49c74cedf3988983b8
1.5 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
60 p.
Report number
WHC-SD--WM-ES-345

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).