Published March 1990 | Version v1
Report Open

LEP status the machine and the experiments

  • 1. European Organization for Nuclear Research, Geneva (Switzerland)

Description

LEP is now very close to completion. The magnets, vacuum system, RF, diagnostics, infrastructure, etc. are in place and undergoing final testing. Much the same can be said about the four LEP detectors. Detailed plans for the commissioning of LEP are laid. The present report provides some information on what has been hapenning at LEP in recent months, and then briefly outlines the programme evolving in the immediate and longer term future. LEP is located within a circular tunnel 27 km in circumference which staddles the border between France and Switzerland. It lies at depths ranging between 50 and 170 m below ground level and is constructed on a slope of 1.4 % to maximize the amount of good rock in which it is built and to minimize its depth under the Jura mountains. The LEP machine is described in the present report focusing on the injection into LEP and the LEP main ring. Features of the four large detectors for LEP, called ALEPH, DELPHI, L3 and Opal, are outlined. The LEP programme is also outlined briefly. When LEP first comes into operation, the amount of installed FR power will be sufficient to accelerate the electrons and positrons up to energies of approximately 55 GeV per beam. (N.K.)

Files

22009609.pdf

Files (575.4 kB)

Name Size Download all
md5:7be4782675461619f5c3fa0e67835b15
575.4 kB Preview Download
Part of:
Proceedings of the KEK topical conference on e+e- collision physics

Additional details

Publishing Information

Imprint Title
Proceedings of the KEK topical conference on e"+e"- collision physics
Imprint Pagination
638 p.
Journal Page Range
p. 314-332.
Report number
KEK--89-23

Conference

Title
KEK topical conference on e"+e"- collision physics.
Dates
17-19 May 1989.
Place
Tsukuba, Ibaraki (Japan).

INIS