Corrosion and hydriding performance evaluation of three zircaloy-2 clad fuel assemblies after continuous exposure in PWR cores 1 and 2, at Shippingport, PA

Description

Three original Zircaloy-2 clad blanket fuel bundles from the pressurized water reactor (PWR) at the Shippingport Atomic Power Station were discharged after continuous exposure during Cores 1 and 2. Detailed visual examination of these components after approx. 6300 calendar days of operation (51,140 EFPH) revealed only the anticipated uniform light gray (post-transition) corrosion products with no evidence of unexpected corrosion deterioration, fuel rod warpage, or other damage. All corrosion films were found to be tightly adherent to the underlying cladding. An extensive destructive examination of a selected fuel rod from each of three fuel bundles produced appreciably greater end-of-life rod average oxide film thickness when compared with corresponding values produced from a set of empirical equations generated from the out-of-pile (autoclave) testing of Zircaloy coupons

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A04/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
69 p.
Report number
WAPD-TM--1412