Design Safety Improvements at Swiss BWRs after Fukushima

  • 1. BKW (Switzerland)

Description

Post-Fukushima Safety Targets: • Assure robustness to withstand and cope with any severe Swiss natural hazard (10000 yearly extreme weather, flooding, earthquake events or combinations). • Assure control of T-LOOP during minimum 72 h without loosing safe shutdown condition. • Assure additional SAM-hardware and necessary auxiliary material as well as SAM staff preparedness (availability, level of training, procedures) so that: - a BDB event (with T-SBO) can be controlled during minimum 72 h without challenging safe shutdown condition; - a BDB event - if safe shutdown is not possible - will be limited to the lowest consequential level: - avoid major core damage; - avoid RPV-damage; - avoid H2-explosion; - avoid major radiological releases to the environment. • Assure safety of long-term fuel pool cooling.

Files

52018000.pdf

Files (2.5 MB)

Name Size Download all
md5:0cb89c923b71e8f044fd4cc76de00b50
2.5 MB Preview Download
Part of:
Technical Meeting on Evaluation of Nuclear Power Plant Design Safety in the Aftermath of the Fukushima Daiichi Accident. Presentations

Additional details

Publishing Information

Imprint Title
Technical Meeting on Evaluation of Nuclear Power Plant Design Safety in the Aftermath of the Fukushima Daiichi Accident. Presentations
Imprint Pagination
vp.
Journal Page Range
39 p.
Report number
INIS-XA--19M3417

Conference

Title
Technical Meeting on Evaluation of Nuclear Power Plant Design Safety in the Aftermath of the Fukushima Daiichi Accident
Dates
26-29 Aug 2013
Place
Vienna (Austria)

INIS

Optional Information

Secondary number(s)
IAEA-J4-TM--46463