Published January 2010 | Version v1
Report Open

Installation and performance test for heating equipment in Cold Neutron Laboratory Building

Description

Heating equipment for Cold Neutron Laboratory Building(CNLB) consist of cold and hot water supplier of absorption type, air conditioner, DC and AC type cooling tower. Operating system of heating equipment is designed to ensure supply and circulation of hot and cold water depending on the operating mode, and this report contains contents of design and concept of operation for safe and efficient management of Cold Neutron Laboratory Building. This report contains drawing production, performance testing, cooling and heating operation, hot and cold water piping maintenance of transformation, electric rates, operating concepts with detailed design information of emplacement heating equipment and performance test for Cold Neutron Laboratory Building

Availability note (English)

Also available from KAERI

Files

42012405.pdf

Files (2.2 MB)

Name Size Download all
md5:c994759cc0faf2b718b7d24571f28f26
2.2 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
97 p.
Report number
KAERI/TR--3944/2009

Optional Information

Notes
7 refs, 19 figs, 25 tabs