Published May 6, 2003 | Version v1
Report Restricted

CH Packaging Operations for High Wattage Waste at LANL

Description

This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00815196; PURL: https://www.osti.gov/servlets/purl/815196-iqBmfN/native/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
99 p.
Report number
DOE/WIPP--02-3220/Rev.3

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
35002507
Subject category
S42: ENGINEERING;
Descriptors DEI
ALPHA-BEARING WASTES; CONTAINERS; LEAK TESTING; MANUALS; PACKAGING; SEALS
Descriptors DEC
DOCUMENT TYPES; MATERIALS; RADIOACTIVE MATERIALS; RADIOACTIVE WASTES; TESTING; WASTES

Optional Information

Contract/Grant/Project number
04-01AL66444
Funding organization
US Department of Energy (United States)