Published May 6, 2003
| Version v1
Report
Restricted
CH Packaging Operations for High Wattage Waste at LANL
Description
This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal
Availability note (English)
Available from INIS in electronic form; Also available from OSTI as DE00815196; PURL: https://www.osti.gov/servlets/purl/815196-iqBmfN/native/
Files
Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 99 p.
- Report number
- DOE/WIPP--02-3220/Rev.3
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 35002507
- Subject category
- S42: ENGINEERING;
- Descriptors DEI
- ALPHA-BEARING WASTES; CONTAINERS; LEAK TESTING; MANUALS; PACKAGING; SEALS
- Descriptors DEC
- DOCUMENT TYPES; MATERIALS; RADIOACTIVE MATERIALS; RADIOACTIVE WASTES; TESTING; WASTES
Optional Information
- Contract/Grant/Project number
- 04-01AL66444
- Funding organization
- US Department of Energy (United States)