Evaluation of Shoreham Nuclear Power Station, Unit 1 technical specifications
Description
This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Shoreham Nuclear Power Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Shoreham T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Shoreham Nuclear Power Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 - GPO as TI86002299.
Files
Additional details
Publishing Information
- Imprint Pagination
- 25 p.
- Report number
- EGG-EA--6992
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 17028896
- Subject category
- S99: GENERAL AND MISCELLANEOUS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- REACTOR PROTECTION SYSTEMS; REACTOR SAFETY; SAFETY ENGINEERING; SHOREHAM REACTOR; SPECIFICATIONS; US NRC; VALVES
- Descriptors DEC
- BWR TYPE REACTORS; CONTROL EQUIPMENT; ENRICHED URANIUM REACTORS; EQUIPMENT; FLOW REGULATORS; NATIONAL ORGANIZATIONS; POWER REACTORS; REACTORS; SAFETY; THERMAL REACTORS; US ORGANIZATIONS; WATER COOLED REACTORS; WATER MODERATED REACTORS