Fault capability problem about seams in Shika NPP

Creators

  • 1. Hokuriku Electric Power Company, Toyama (Japan)

Description

Against the opinion of the Nuclear Regulation Authority that insists that the on-site seams of Shika Nuclear Power Plant is fault, Hokuriku Electric Power Company shows the view that they are not the fault. Additional survey result was submitted by Hokuriku Electric Power Company, and the evaluation draft for it by the expert meeting of Nuclear Regulation Authority, as well as the peer review were published. The evaluation draft mentioned that the seams cannot be denied for the possibility to become active, and the peer review issued many evaluations different from the evaluation draft. This paper describes the contents of the evaluation draft and peer review summarized by Hokuriku Electric Power Company. Against the three major points of the evaluation draft, the peer review pointed out the defect of fact recognition in every issue of discussion that lacks in examination on the points that should have been checked, and questioned the eligibility of the contents of evaluation. Many of the suggestions and comments of the peer review were the contents that approved the on-site survey and the report at the expert meeting made by Hokuriku Electric Power Company. In addition, this paper summarizes the focal points of the evaluation draft, and points out the question for fault assumption and discrepancies in the case of existence of fault. Hokuriku Electric Power Company has published a rebuttal to the evaluation draft as the written opinion. (A.O.)

Additional details

Publishing Information

Journal Title
Karyoku Genshiryoku Hatsuden
Journal Volume
67
Journal Issue
5
Journal Page Range
p. 315-320
ISSN
0387-1029

Optional Information

Notes
8 refs., 5 figs.