Decommissioning of Ames Laboratory Research Reactor
Description
The Ames Laboratory Research Reactor (ALRR) was constructed between 1961 and 1965 on a 35-acre open site about 1-1/2 miles from the Iowa State University campus and the rest of the Ames Laboratory facilities. Initial criticality was attained in February and full power in July 1965. Full-time operation was initiated in June 1966. Final reactor shutdown occurred on December 31, 1977, with an accumulation of 1.52 x 104 megawatt days. The reactor decommissioning program was initiated at that point, and was essentially completed by October 1, 1981. Total radiation exposure for the decommissioning program was 69.4 man-rem distributed among 92 persons. The total cost of the program was 4.335 million dollars. Although the initial intent was to be able to release the facility for unrestricted use on completion of decommissioning, the widely dispersed presence of low-level fixed radioactivity on reactor room surfaces and in imbedded piping resulted in the application of a monitored use criterion. 3 references, 2 figures, 2 tables
Additional details
Publishing Information
- Imprint Title
- 1982 international decommissioning symposium
- Journal Page Range
- p. IV.19-IV.38.
- Report number
- CONF-821005--
Conference
- Title
- DOE international decommissioning symposium.
- Dates
- 10-14 Oct 1982.
- Place
- Seattle, WA (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 15001930
- Subject category
- S61: RADIATION PROTECTION AND DOSIMETRY; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ALRR REACTOR; COST; RADIATION DOSES; REACTOR DECOMMISSIONING
- Descriptors DEC
- DECOMMISSIONING; ENRICHED URANIUM REACTORS; HEAVY WATER COOLED REACTORS; HEAVY WATER MODERATED REACTORS; IRRADIATION REACTORS; ISOTOPE PRODUCTION REACTORS; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; TANK TYPE REACTORS; THERMAL REACTORS