Published 1985 | Version v1
Report Open

Safety implications from 20 years of operating experience at EBR-II

Description

EBR-II recently passed a major milestone in its operating history, 20 years of operation on August 13, 1984. The plant has gone through three major program phases during this time and is now entering a fourth. Those are: (1) demonstration of the feasibility of a complete LMFBR power plant, including on-site reprocessing of metal fuel, (2) irradiation testing of fuels and materials to support core and fuel design for CRBR and FFTF, (3) operational-safety testing to establish and demonstrate the inherent safety of LMFBRs and now, (4) the integration of this technology into demonstration of the integral fast reactor (IFR) concept. As EBR-II has progressed through these phases, much has been learned that is relevant to fast-reactor safety

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE85004039.

Files

16064892.pdf

Files (94.3 kB)

Name Size Download all
md5:1128a45e45be68e7d07413a605a2b4dd
94.3 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
6 p.
Report number
CONF-850410--15

Conference

Title
ANS/ENS fast reactor safety meeting.
Dates
21-24 Apr 1985.
Place
Knoxville, TN (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
16064892
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
EBR-2 REACTOR; REACTOR OPERATION; REACTOR SAFETY
Descriptors DEC
BREEDER REACTORS; EPITHERMAL REACTORS; EXPERIMENTAL REACTORS; FAST REACTORS; FBR TYPE REACTORS; LIQUID METAL COOLED REACTORS; LMFBR TYPE REACTORS; OPERATION; POWER REACTORS; REACTORS; RESEARCH AND TEST REACTORS; SAFETY; SODIUM COOLED REACTORS