Published October 1, 2015 | Version v1
Report

Delivery of completed irradiation vehicles and the quality assurance document to the High Flux Isotope Reactor for irradiation

  • 1. Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)

Description

This report details the initial fabrication and delivery of two Fuel Cycle Research and Development (FCRD) irradiation capsules (ATFSC01 and ATFSC02), with associated quality assurance documentation, to the High Flux Isotope Reactor (HFIR). The capsules and documentation were delivered by September 30, 2015, thus meeting the deadline for milestone M3FT-15OR0202268. These irradiation experiments are testing silicon carbide composite tubes in order to obtain experimental validation of thermo-mechanical models of stress states in SiC cladding irradiated under a prototypic high heat flux. This document contains a copy of the completed capsule fabrication request sheets, which detail all constituent components, pertinent drawings, etc., along with a detailed summary of the capsule assembly process performed by the Thermal Hydraulics and Irradiation Engineering Group (THIEG) in the Reactor and Nuclear Systems Division (RNSD). A complete fabrication package record is maintained by the THIEG and is available upon request.

Availability note (English)

Available from http://info.ornl.gov/sites/publications/files/Pub59327.pdf; PURL: http://www.osti.gov/servlets/purl/1222574/

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
ORNL/LTR--2015/569

Optional Information

Contract/Grant/Project number
AC05-00OR22725
Funding organization
USDOE Office of Nuclear Energy (Niger) (US)
Secondary number(s)
OSTIID--1222574