Published August 1984 | Version v1
Report Open

Experimental manufacturing of fuel rod simulators with instrument outfit for Fix-II

Description

The length of life of the earlier samples of simulators for the bundle of 36 fuel rods was estimated to be limited. A number of reserve rods have been manufactured and quality control has been performed on 6 complete rods. Improvements have been made in comparison with the earlier samples which displayed a scattering of stage dimensions and power factors. The mounting of thermocouples also caused breakdowns. New manufacturing methods are described. (G.B.)

Availability note (English)

MF available from INIS under the Report Number.

Files

16046244.pdf

Files (437.9 kB)

Name Size Download all
md5:1c83e985599c4bb9cb36c0c612dc9d0a
437.9 kB Preview Download

Additional details

Additional titles

Subtitle (English)
Final report on SKI commission B 26/81
Original title (Swedish)
Provtillverkning av instrumenterade braenslestavssimulatorer foer FIX-II
Original subtitle (Swedish)
Slutrapport foer SKI-uppdrag B26/81.

Publishing Information

Imprint Pagination
30 p.
Report number
SKI-B--26-81

INIS

Country of Publication
Sweden
Country of Input or Organization
Sweden
INIS RN
16046244
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Progress Report
Descriptors DEI
DEFECTS; FABRICATION; FUEL ELEMENT CLUSTERS; FUEL RODS; MEASURING INSTRUMENTS; QUALITY CONTROL; SIMULATION; SWEDEN
Descriptors DEC
CONTROL; DEVELOPED COUNTRIES; EUROPE; FUEL ASSEMBLIES; FUEL ELEMENTS; REACTOR COMPONENTS; SCANDINAVIA

Optional Information

Contract/Grant/Project number
Contract SKI-G.2.1-2461-77
Secondary number(s)
STUDSVIK-NR--84-459.