Uncertainties in NDE Reliability and Assessing the Impact on RI-ISI

Description

A major thrust in the past 20 years has been to upgrade nondestructive examinations (NDE) for use in inservice inspection (ISI) programs to more effectively manage degradation at operating nuclear power plants. Risk-informed ISI (RI-ISI) is one of the outcomes of this work, and this approach relies heavily on the reliability of NDE, when properly applied, to detect sources of expected degradation. There have been a number of improvements in the reliability of NDE, specifically in ultrasonic testing (UT), through training of examiners, and improved equipment and procedure development. However, the most significant improvements in UT were derived by moving from prescriptive requirements to performance based requirements. Even with these substantial improvements, NDE contains significant uncertainties and RI-ISI programs need to address and accommodate this factor. As part of the work that PNNL is conducting for the U. S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, we are examining the impact of these uncertainties on the effectiveness of RI-ISI programs.

Availability note (English)

Available from American Society of Mechanical Engineers, New York, NY (US)

Additional details

Publishing Information

Imprint Pagination
vp.
Report number
PNNL-SA--71917

Conference

Title
ASME 2010 Pressure Vessels and Piping Division (PVP) Conference
Dates
18-22 Jul 2010
Place
Bellevue, WA (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
42061252
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
NUCLEAR POWER PLANTS; PERFORMANCE; PRESSURE VESSELS; RELIABILITY; TRAINING; ULTRASONIC TESTING
Descriptors DEC
ACOUSTIC TESTING; CONTAINERS; EDUCATION; MATERIALS TESTING; NONDESTRUCTIVE TESTING; NUCLEAR FACILITIES; POWER PLANTS; TESTING; THERMAL POWER PLANTS

Optional Information

Contract/Grant/Project number
401001060; AC05-76RL01830
Notes
K Hasegawa; 6B:1157-1166, PVP2010-25798
Funding organization
US Department of Energy (United States)