Tracing fuel failures at Angra 1
Creators
- 1. Furnas Centrais Eletricas, Rio de Janeiro (Brazil). Engineering and Nuclear Fuel Dept.
Description
The Angra 1 PWR in Brazil has operated 3 successful fuel cycles since commencing commercial operation in 1985. However, in March 1993, in cycle 4, high activity in the reactor cooling system led to a shut down. The reactor core has 121 fuel assemblies each containing 235 Zircaloy-4 fuel rods supported by Inconel-718 spacer grids. After the shut down in-mast sipping (IMS) inspection identified 18 leaking assemblies, ultrasonic tests found that 16 of these had failed and disclosed 5 failed assemblies not identified by IMS, visual inspection revealed 76 loose and/or fretted fuel rods in 13 assemblies. The main failure mechanism was grid-to-rod fretting with inadequate design of the spacer grid springs suspected as the root cause. The reactor was due to restart in June 1994 after a loss of about 1900 GWh and operational and neutronics consequences which will extend to the plant's 14th cycle. (UK)
Additional details
Publishing Information
- Journal Title
- Nuclear Engineering International
- Journal Volume
- 39
- Journal Issue
- 482
- Journal Page Range
- p. 32-34.
- ISSN
- 0029-5507
- CODEN
- NEINBF
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- United Kingdom
- INIS RN
- 26002002
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- ANGRA-1 REACTOR; DESIGN; FAILURES; FUEL ASSEMBLIES
- Descriptors DEC
- ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS