Published November 13, 1979 | Version v1
Report Restricted

Final design of the neutral beam lines for the Tokamak Fusion Test Reactor

Description

Final design of the neutral beam lines for TFTR has been completed. A prototype has been assembled at Lawrence Berkeley Laboratory and is undergoing testing as part of the Neutral Beam System Test Facility (NBSTF). The final neutral beam line (NBL) configuration differs in several details from that previously reported upon; certain components have been added; and testing of the cryopump system has led to some design simplification. It is these developments which are reported herein

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
11 p.
Report number
UCRL--82911

Conference

Title
8. symposium on engineering problems of fusion research.
Dates
13 - 16 Nov 1979.
Place
San Francisco, CA, USA.

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
11519411
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ATOMIC BEAM SOURCES; BEAM TRANSPORT; CALORIMETERS; CRYOPUMPS; NEUTRAL ATOM BEAM INJECTION; SPECIFICATIONS; TFTR DEVICE
Descriptors DEC
BEAM INJECTION; CLOSED PLASMA DEVICES; MEASURING INSTRUMENTS; PUMPS; THERMONUCLEAR DEVICES; TOKAMAK DEVICES; VACUUM PUMPS

Optional Information

Secondary number(s)
CONF-791102--27.