Published 1990
| Version v1
Miscellaneous
Construction
Creators
- 1. Ontario Hydro, Bowmanville, ON (Canada). Darlington Nuclear Generating Station-A
- 2. Ontario Hydro, Toronto, ON (Canada)
- 3. Atomic Energy of Canada Ltd., Sheridan Park, ON (Canada). CANDU Operations
Description
The next CANDU nuclear unit may be a repeat of an existing design or a pre-engineered prototype of an all-new design. Regardless, the common feature will be a late commitment to power requirements and a shortage of money. The pressure will be on to shorten durations and cut costs while maintaining quality. The ability to influence the cost of a project decreases rapidly as the project progresses. Hence it is essential to look at phases that come before construction in the project cycle. Maximum benefits occur when the optimum use is made of construction knowledge and experience in planning, design, procurement and construction to achieve overall project objectives. (L.L.)
Additional details
Additional titles
- Subtitle (English)
- Getting ready for the next one
Publishing Information
- Imprint Title
- Proceedings of the 30. Annual Conference of the Canadian Nuclear Association
- Imprint Pagination
- 245 p.
- Journal Page Range
- p. 3.19-3.35.
- Report number
- INIS-mf--13846
Conference
- Title
- Canadian Nuclear Association 30. Annual Conference.
- Dates
- 3-6 Jun 1990.
- Place
- Toronto, ON (Canada).
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 25031742
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CANDU TYPE REACTORS; CONSTRUCTION; COST; MANAGEMENT; MODULAR STRUCTURES; PLANNING; SCHEDULES
- Descriptors DEC
- HEAVY WATER MODERATED REACTORS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTORS; THERMAL REACTORS