241-SY-101 Pump Decon System Acceptance Test Procedure

Description

The SY-101 Pump Decon System has components that consist of the water filter skid to assembly operation, the pump pit flooding system, and the system set up using air blow the water out of the decon hose. The Acceptance Test Procedure (ATP) consists of four parts. The first part will calibrate water and flow meters. The second part will determine the pressure loss on the water traveling through the filter skid at various flow rates. The third part will determine the length of time it takes to drain 1350 gallons of water out of a tank through 300 feet of discharge hose. The fourth part will verify that the calculated air volume and pressure in an air receiver is adequate to blow all the water out of a 2 inch diameter water hose

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95010574; NTIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
49 p.
Report number
WHC-SD--WM-ATP-125

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
26069992
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS; S61: RADIATION PROTECTION AND DOSIMETRY;
Descriptors DEI
CALIBRATION; CERTIFICATION; DECONTAMINATION; FILTERS; FLOW RATE; PRESSURE DROP; PUMPS; QUALITY ASSURANCE; RADIATION PROTECTION; TESTING
Descriptors DEC
CLEANING; EQUIPMENT

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).