Published May 1975 | Version v1
Report Open

Demolition and removal of plutonium-contaminated facilities at Hanford

Description

The successful demolition and cleanup of a plutonium-contaminated facility at the U. S. Energy Research and Development Administration Hanford Plant in Washington State are described. Several new materials, along with special techniques and equipment, were utilized for the containment and control of plutonium contamination during the course of the demolition work. The use of light-capacity fiberglassed plywood boxes for long-term (20-year, minimum) storage of the contaminated materials in underground transuranic waste trenches has led to the development, design and use of larger capacity modular fiberglassed plywood boxes that are replacing standard carbon steel boxes at less than one-third the cost, and without the potential for early failure from normal soil or atmospheric corrosion. (U.S.)

Availability note (English)

MF available from INIS under the Report Number.

Files

7228809.pdf

Files (10.1 MB)

Name Size Download all
md5:64f947160c29f24ef5153296a090891d
10.1 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
40 p.
Report number
ARH-SA--223

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
7228809
Subject category
S42: ENGINEERING; S38: RADIATION CHEMISTRY, RADIOCHEMISTRY AND NUCLEAR CHEMISTRY;
Descriptors DEI
CONTAMINATION; DEMOLITION; HAPO; NUCLEAR FACILITIES; PLUTONIUM
Descriptors DEC
ACTINIDES; ELEMENTS; METALS; NATIONAL ORGANIZATIONS; TRANSURANIUM ELEMENTS; US AEC; US ERDA; US ORGANIZATIONS