Handling the unexpected
Description
Complex engineering projects always give rise to unexpected problems, and this was appreciated when the design of the Heysham 2 and Torness Power Stations first started. The likelihood of unexpected problems arising was minimised by repeating design features from previous stations whenever it was practicable to do so. Furthermore independent staff were used to check all work done in line with standard Quality Assurance practice. Programmes for building the stations included allowances for a limited amount of unexpected re-engineering, and the superheater penetrations, standpipe cracking and control rod instability problems are used as examples of difficulties which arose and were subsequently overcome without undue adverse programme effects. (author)
Additional details
Additional titles
- Augmented title (English)
- During the construction of Heysham-B and Torness reactors
Publishing Information
- Publisher
- British Nuclear Energy Society.
- Imprint Place
- London (UK)
- ISBN
- 0 7277 1352 3
- Imprint Title
- Nuclear power station project management
- Imprint Pagination
- 231 p.
- Journal Page Range
- p. 183-189.
Conference
- Title
- Conference on nuclear power station project management.
- Dates
- 20-22 Jul 1988.
- Place
- Blackpool (UK).
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- United Kingdom
- INIS RN
- 20069589
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONSTRUCTION; CONTROL ELEMENTS; CRACKS; HEYSHAM-B REACTOR; QUALITY ASSURANCE; SCHEDULES; SPECIFICATIONS; STANDARDIZATION; SUPERHEATERS; TORNESS REACTOR; VERIFICATION
- Descriptors DEC
- AGR TYPE REACTORS; CARBON DIOXIDE COOLED REACTORS; ENRICHED URANIUM REACTORS; GAS COOLED REACTORS; GRAPHITE MODERATED REACTORS; POWER REACTORS; REACTOR COMPONENTS; REACTORS; THERMAL REACTORS
Optional Information
- Notes
- Discussion on paper - p. 199-201.