Published 1988 | Version v1
Journal article

A systematic method for protecting industrial production from sabotage

  • 1. ERCI Inc., Albuquerque,, NM (USA)
  • 2. Sandia National Labs., Albuquerque, NM (USA)

Description

The U.S. DOE initiated the Production Risk Evaluation Program (PREP) at Sandia National Laboratoires (SNL) to assess quantitatively the potential for serious production disruption as the result of random failures, accidents, natural disasters, or sabotage at its facilities. SNL developed a procedure incorporating both network and fault tree models that identifies production vulnerabilities. For each production step, a steady-state flow model computes the ''critical time,'' which is the maximum period a step can be shut down without preventing the system from achieving production goals. The critical time is then used in fault tree analysis to determine the failure modes that can stop the process for longer than this period. Modular logic modeling is used for constructing the fault trees. Equipment restorable within it s critical time need not be considered critical even though it may perform significant work. The PREP models can be used to identify those plant areas to which a saboteur would need to gain access. A security strategy using graded protection could potentially save money. PREP methods also provide quantitative insights to develop protection measures that do not infringe upon the liberties of personnel or complicate work practices

Additional details

Publishing Information

Journal Title
Nuclear Materials Management
Journal Volume
17
Series
Nucl. Mater. Manage.
Journal Page Range
82-85
ISSN
0362-0034
CODEN
NUMMB

Conference

Title
29. annual meeting of the Institute of Nuclear Materials Management.
Dates
26-29 Jun 1988.
Place
Las Vegas, NV (USA).

Optional Information

Secondary number(s)
CONF-880631--.