Fort St. Vrain fuel-handling system RAM analysis

  • 1. Rockwell International, Canoga Park, CA (USA)

Description

Public Service of Company of Colorado (PSC) is planning to decommission its Fort St. Vrain plant in 1990. This requires removal of 1,500 separate assemblies from the core. With the low historical availability of the fuel-handling system (FHS), defueling time was estimated at 36 months. With plant expenses of approximately $1.6 million per month during defueling, this would mean a schedule cost of $58 million. With their contractor, Rockwell International, PSC embarked on a reliability, availability, and maintainability (RAM) analysis to reduce projected defueling time. Key elements included (a) estimating availability of the FHS using a limited historical record, (b) assessing the defueling critical path, and (c) proposing and evaluating design/operational improvements. The most cost-effective improvements are being implemented and are expected to provide a reduction of >18 months in schedule and a net savings of $20 to 25 million. The paper describes the FHS design and operation, major problems associated with fuel-handling operations, and results and recommendations

Additional details

Publishing Information

Journal Title
Transactions of the American Nuclear Society
Journal Volume
60
Series
Trans. Am. Nucl. Soc.
Journal Page Range
469
ISSN
0003-018X
CODEN
TANSA

Conference

Title
Winter meeting of the American Nuclear Society (ANS) and nuclear power and technology exhibit.
Dates
26-30 Nov 1989.
Place
San Francisco, CA (USA).

Optional Information

Secondary number(s)
CONF-891103--.