Analyses of the failed impulsion lines of NPP Dukovany steam generator

Description

Three fractured segments of the impulsion piping were analyzed and the root cause was identified. One segment had been fractured due to smaller wall thickness and wrong geometry. The other two segments had been fractured due to stress corrosion cracking. Chloride was present at the inner surface of the tubes, presumably as a residue from the manufacturing phase. Several possible countermeasures were proposed: prevent mechanical deformation of the tubing; proceed with tightness testing, analyze and clean the inner surface of all newly installed tubes, perform non-destructive testing of important segments and pressurize the piping

Files

42016142.pdf

Files (1.0 MB)

Name Size Download all
md5:f37b3c86e37d57989fdc7999fd30b0de
1.0 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
17 p.
Report number
INIS-CZ--0090

Conference

Title
International topical meeting on VVER-2010 - experience and perspectives
Dates
1-3 Nov 2010
Place
Prague (Czech Republic)

Optional Information

Notes
Presented within Section 2, Safety, using this document as a PowerPoint presentation. (Actually, although downloaded from the conference website, the presentation itself is dated 9 Jan 2011.) The conference programme can be viewed and the contributions downloaded from the TERIS a.s. website at http://www.teris.cz/vver2010.htm. 3 tabs., 24 ills.