Published 1958 | Version v1
Report Open

Experience gained in two years operation of G1

  • 1. Commissariat a l'Energie Atomique, Saclay (France). Centre d'Etudes Nucleaires
  • 2. Electricite de France (EDF), 75 - Paris (France)

Description

Technical specifications in respect of the first plutonium generating graphite reactor, the G1 at Marcoule, were stated in a paper read at the first Geneva Conference in 1955. We shall not therefore deal further with the technical characteristics of G1 in the present note, but rather propose to define - in the characteristic fields we think will be of major interest to foreign specialists - the results obtained in two and a half years operation since G1 first became critical on january 7, 1956. (author)

Availability note (English)

Available from INIS in electronic form

Abstract (French)

Les caracteristiques techniques du premier reacteur plutonigene, au graphite, de Marcoule, G1, ont ete donnees dans une communication presentee a la premiere conference de Geneve, en 1955. Nous n'y reviendrons donc pas dans la presente note qui a pour objet de faire le point, dans quelques domaines caracteristiques, qui nous ont paru les plus susceptibles d'interesser les specialistes etrangers, des resultats obtenus et des experiences faites au cours des deux annees et demi de fonctionnement du reacteur qui ont suivi sa divergence, le 7 janvier 1956. (auteur)

Files

38063224.pdf

Files (1.7 MB)

Name Size Download all
md5:1a5b81eb27bda7bbdc7f36516e6d11b6
1.7 MB Preview Download

Additional details

Additional titles

Original title (French)
Experience acquise au cours de deux ans de fonctionnement du reacteur G1

Publishing Information

Imprint Pagination
18 p.
Report number
CEA-R--950

Optional Information

Notes
1 refs.