Published June 13, 2000 | Version v1
Report

Survey and alignment of the Fermilab Recycler Antiproton Storage Ring

Description

In June of 1999 Fermilab commissioned a newly constructed antiproton storage ring, the Recycler Ring, in the Main Injector tunnel directly above the Main Injector beamline. The Recycler Ring is a fixed 8 GeV kinetic energy storage ring and is constructed of strontium ferrite permanent magnets. The 3,319.4-meter-circumference Recycler Ring consists of 344 gradient magnets and 100 quadrupoles all of which are permanent magnets. This paper discusses the methods employed to survey and align these permanent magnets within the Recycler Ring with the specified accuracy. The Laser Tracker was the major instrument used for the final magnet alignment. The magnets were aligned along the Recycler Ring with a relative accuracy of ±0.25

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/756500-zfQDKF/webviewable/

Additional details

Publishing Information

Imprint Pagination
274 Kilobytes
Report number
FERMILAB-Conf--00/103

Conference

Title
6. International Workshop on Accelerator Alignment
Dates
18-22 Oct 1999
Place
Grenoble (France)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
32032244
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ALIGNMENT; ANTIPROTON BEAMS; FERMILAB TEVATRON; MEASURING METHODS; PERMANENT MAGNETS; STORAGE RINGS
Descriptors DEC
ACCELERATORS; ANTINUCLEON BEAMS; ANTIPARTICLE BEAMS; BEAMS; CYCLIC ACCELERATORS; EQUIPMENT; MAGNETS; SYNCHROTRONS

Optional Information

Contract/Grant/Project number
AC02-76CH03000
Notes
This record replaces 31034560
Funding organization
USDOE Office of Energy Research (ER) (United States)