Published February 1978 | Version v1
Report Restricted

Core test program: UWNR mixed TRIGA-FLIP core

Description

Six new FLIP fuel bundles (Nos. 43 through 48) and one standard instrumented element were received on December 28, 1977. Normal fuel element measurements were performed on the new FLIP fuel bundles and the instrumented fuel element was prepared for service by attaching conduit and connecting thermocouple leads to an appropriate connector. A loading to critical was begun on December 20, 1977, and completed on January 3, 1978. Initial criticality was reached at 1340 on January 3, 1978, with 19 fuel bundles in the core and control rods banked at 15.12 inches withdrawn. Shutdown margin of the 19-bundle critical core was measured to be 7.8% reactivity

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A03/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
32 p.
Report number
TID--29009