Water-hammer experiences in the startup and early operation of the Shearon Harris plant
Creators
Description
During the startup testing and initial operation of any power plant, systems undergo planned transients to confirm their ability to respond as designed. In addition to planned testing, unplanned transients infrequently occur as equipment is initially used. Some of both the planned and unplanned transients result in water-hammer events. Several water-hammer events experienced during preoperational testing, power ascension testing, and early operation of the Shearon Harris nuclear power plant are presented. The cause, effect, and corrective actions undertaken to prevent recurrence for each event discussed are provided. In addition, examples of preventive measures taken, based on industry experience accrued at other plants, to prevent a similar occurrence at Shearon Harris are discussed
Additional details
Publishing Information
- Journal Title
- Transactions of the American Nuclear Society
- Journal Volume
- 55
- Series
- Trans. Am. Nucl. Soc.
- Journal Page Range
- 735
- ISSN
- 0003-018X
- CODEN
- TANSA
Conference
- Title
- American Nuclear Society winter meeting.
- Dates
- 15-19 Nov 1987.
- Place
- Los Angeles, CA (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 20003843
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- HARRIS-1 REACTOR; HARRIS-2 REACTOR; HARRIS-3 REACTOR; HARRIS-4 REACTOR; HYDRAULICS; REACTOR OPERATION; REACTOR SHUTDOWN; REACTOR START-UP; SAFETY ENGINEERING; STEAM GENERATORS; TESTING; TRANSIENTS; VOID FRACTION; WATER HAMMER
- Descriptors DEC
- BOILERS; ENRICHED URANIUM REACTORS; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTORS; SHUTDOWN; START-UP; THERMAL REACTORS; VAPOR GENERATORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Secondary number(s)
- CONF-8711195--.