Published January 2000 | Version v1
Report

Assessment of the efficiency of the diversion signal to the ESFAS. Operator intervention 30 minutes after the transient process has set in. Units 1-4. Rev. 1

Description

The effect of the situation where the Engineered Safety Features Actuation System (ESFAS) fails and subsequently the diversion signal (operator's intervention) is triggered was investigated for the Dukovany nuclear power plant with respect to the behavior of selected initiating events whose frequency exceeds 1x10-3/yr. The initiating events were selected from a list in the safety documentation, the frequency having been assessed within a probabilistic safety assessment. (P.A.)

Availability note (English)

Available from Nuclear Research Institute Rez, 250 68 Rez, Czech Republic; e-mail contact: ret@nri.cz

Additional details

Additional titles

Original title (Czech)
Posouzeni ucinnosti diverzniho signalu k ESFAS. Zasah operatora po 30 min od zacatku prechodoveho procesu. Blok 1-4. Revize 1
Augmented title (English)
Dukovany NPP

Publishing Information

Imprint Pagination
10 p.
Report number
UJV--11385-T

INIS

Country of Publication
Czech Republic
Country of Input or Organization
Czech Republic
INIS RN
33027459
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
DUKOVANY-1 REACTOR; REACTOR OPERATORS; REACTOR PROTECTION SYSTEMS; REACTOR SAFETY; SCRAM; SIGNALS
Descriptors DEC
ENGINEERED SAFETY SYSTEMS; ENRICHED URANIUM REACTORS; PERSONNEL; POWER REACTORS; PWR TYPE REACTORS; REACTOR SHUTDOWN; REACTORS; SAFETY; SHUTDOWN; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWER TYPE REACTORS

Optional Information

Notes
1 tab., 10 refs.