Emergency preparedness in the future

Description

This speech discusses safety issues facing nuclear power generation in terms of their contribution to increased costs of construction. The view is advanced that improvements in regulatory methods could be achieved by improvements in probabilistic risk assessment. The major deficiency in risk assessment is that the consequence assessments are not realistic and accident consequences not well understood. It is demonstrated that realistic modelling of evacuation times and other emergency preparedness capabilities can significantly reduce the calculated risk of operating nuclear power plants

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE83012796.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
8 p.
Report number
PNL-SA--11277

Conference

Title
Health Physics Society Chapter meeting.
Dates
1 May 1983.
Place
Richland, WA (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
14792522
Subject category
S61: RADIATION PROTECTION AND DOSIMETRY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
COST; EMERGENCY PROVISIONS; NUCLEAR POWER PLANTS; PUBLIC OPINION; RADIATION ACCIDENTS; REACTOR SAFETY; RECOMMENDATIONS; REGULATIONS; RISK ANALYSIS
Descriptors DEC
ACCIDENTS; LAW; NUCLEAR FACILITIES; POWER PLANTS; SAFETY; THERMAL POWER PLANTS